DEDICATED FREIGHT CORRIDOR
Client: INDIAN TECHNOCRAT Ltd
Project Description
Preparation of Technical bid for Contract packages 201 & 202 for New Karchana To New Bhaupur project of Eastern Dedicated Freight Corridor Project(DFCCIL).
Services by SCPL.
- Design of Steel truss bridges of spans 24m, 62.8m & 78.88m as per Indian Railway standards for DFCCIL loading
- Design of Steel Composite bridges of spans 4m, 28m & 30.5m as per Indian Railway standards for DFCCIL loading
- Preliminary Design of 563 Major and Minor bridges including steel and composite superstructure, substructre and foundations.
- Detailed BOQ for substructure, foundation and superstructure of all Major and Minor Bridges